Project: LED streetlight for State Local Council
Project background
·To replace 11,000 units of conventional HPSV street light with LED Street light within 12 month
Challenges
·Site to identify and trouble shoot the cable connectivity issues such as circuit breaker, and disconnected power line before replacing the street light
·Photometric and power consumption measurement at the actual site, this is to capture the data before and after the LED street light replacement.
·To design and product the LED street light out of the site study
Result & Benefits
·Better illuminance and power consumption after the LED street light replacement
·Energy saving up to 50%
·Less street light malfunction complaint from the road user
·Provides better vision and safety to the road user
Project background
·To replace 11,000 units of conventional HPSV street light with LED Street light within 12 month
Challenges
·Site to identify and trouble shoot the cable connectivity issues such as circuit breaker, and disconnected power line before replacing the street light
·Photometric and power consumption measurement at the actual site, this is to capture the data before and after the LED street light replacement.
·To design and product the LED street light out of the site study
Result & Benefits
·Better illuminance and power consumption after the LED street light replacement
·Energy saving up to 50%
·Less street light malfunction complaint from the road user
·Provides better vision and safety to the road user
Project background
·Provide Second Penang Bridge a total solution of Traffic Control and Surveillance System
Challenges
·To design and product the LED Sign Board out of the site study and specifications
·To assemble and setup large LED Sign Board at factory and deliver to site for installation
·Site to identify and trouble shoot the devices connectivity issues such as network switches configuration, fiber optics converter connections, microwave transceiver receptions and terminal server configuration
Result & Benefits
·Provides safety reminder to road user and information of the upcoming events in the region
·Allow road user aware of the traffic flow condition as road user can decide any alternative routes
·Provide Second Penang Bridge a total solution of Traffic Control and Surveillance System
Challenges
·To design and product the LED Sign Board out of the site study and specifications
·To assemble and setup large LED Sign Board at factory and deliver to site for installation
·Site to identify and trouble shoot the devices connectivity issues such as network switches configuration, fiber optics converter connections, microwave transceiver receptions and terminal server configuration
Result & Benefits
·Provides safety reminder to road user and information of the upcoming events in the region
·Allow road user aware of the traffic flow condition as road user can decide any alternative routes
Project: Fleet Tracking System for Buses
Project background
·Provide total solution of Fleet Tracking System for its Rapid KL Buses
Challenges
·To design and product the GPS Tracking Device and Public Information LED Display out of the site study and specifications
·Site to identify and trouble shoot the connectivity issues for the devices such as network switches configuration, fiber optics converter connections, and terminal server configuration. Replace and re-configuration if faulty identified
·On bus identify and trouble shoot GPS tracking devices connectivity and reception issues such as antenna, fuses and cable connections. Replace and re-configuration if faulty identified
Result & Benefits
·Allow bus operator identify bus location and status of the buses
·Allow bus operator re-schedule or add bus routes
·Provides bus arrival time for passenger via LED Display
·Accuracy of the bus schedule reduce passenger waiting time
Project background
·Provide total solution of Fleet Tracking System for its Rapid KL Buses
Challenges
·To design and product the GPS Tracking Device and Public Information LED Display out of the site study and specifications
·Site to identify and trouble shoot the connectivity issues for the devices such as network switches configuration, fiber optics converter connections, and terminal server configuration. Replace and re-configuration if faulty identified
·On bus identify and trouble shoot GPS tracking devices connectivity and reception issues such as antenna, fuses and cable connections. Replace and re-configuration if faulty identified
Result & Benefits
·Allow bus operator identify bus location and status of the buses
·Allow bus operator re-schedule or add bus routes
·Provides bus arrival time for passenger via LED Display
·Accuracy of the bus schedule reduce passenger waiting time
Project: Full Colour Video LED Display Panel For Shopping Mall
Project background
·To install 3 LED screen at Shopping Mall, Komtar, Penang
Challenges
·Site to identify and locating suitable truss structure for ceiling mount LED Display Panel
·Video editing and scheduler LED Display Panel
·To install and trouble shoot LED Display Panel at ceiling height
Result & Benefits
·Large LED Display gives better vision for viewer during presentation and stage event.
·Large LED Display allows advertisement and attracts more visitors and tourists.
Project background
·To install 3 LED screen at Shopping Mall, Komtar, Penang
Challenges
·Site to identify and locating suitable truss structure for ceiling mount LED Display Panel
·Video editing and scheduler LED Display Panel
·To install and trouble shoot LED Display Panel at ceiling height
Result & Benefits
·Large LED Display gives better vision for viewer during presentation and stage event.
·Large LED Display allows advertisement and attracts more visitors and tourists.